NCC Compliance Advice
Rather than waiting for a formal assessment to tell you what is wrong, we work alongside your designer and answer code questions as they come up.
When It Helps
Best used before the drawings are locked.
Early design, feasibility, unusual buildings, change of use, or any project where a code question is holding up a decision. Also useful on existing buildings where nobody is certain what the current obligations are.
Building classification
What class the building is, and what that pulls in — the decision everything else follows from.
Access and egress
Travel distances, exit widths and paths of travel, tested against the design as drawn.
Fire safety
Resistance levels, separation and the systems the class of building requires.
Accessibility
Obligations under the relevant standards for your project.
01
Tell us the question
A single query or an ongoing engagement — both work.
02
We agree the scope
Hourly or fixed, whichever suits the job, in writing.
03
You get an answer
Written where you need a record, on a call where you just need to keep moving.
Common Questions
Answers before you ask.
How is this different from a BCA report?
Can you advise if you will later certify the project?
There are limits on what a certifier can do on a project they will certify. We will tell you where that line sits before you engage us.
Will you work directly with my architect?
Yes, and it is usually the most efficient way to do it.
Ready to get your project moving?
Get in touch for a simple, no-obligation discussion about your building surveying and certification needs.